Project: 5179 Guangdong Taishan Xiachuandao Wind Farm Project - Crediting Period Renewal Request
[]
Project 5179: Guangdong Taishan Xiachuandao Wind Farm Project

- project design document (865 KB)

PDD appendices
Appendix 1 - ER calculation 5179 (14 KB)

- crediting period renewal form (151 KB)
Methodologies Used ACM0002 ver. 20 - Grid-connected electricity generation from renewable sources
VVS Version VVS-PA 2.0
Standardized baselines used N/A
Amount of Reductions 52,975 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (431 KB)
Renewal Date 09 Sep 20 (Renewable)   (view history)   info & rep check: concluded
Crediting Period (requested for renewal) 25 Sep 19 - 24 Sep 26

Other crediting period(s): 25 Sep 12 - 24 Sep 19
Requests for Issuance
and related documentation