05:23 07 Nov 25
Project:
5179 Guangdong Taishan Xiachuandao Wind Farm Project
- Crediting Period Renewal Request
[]
| Project |
5179: Guangdong Taishan Xiachuandao Wind Farm Project
- project design document (865 KB)
PDD appendices Appendix 1 - ER calculation 5179 (14 KB)
- crediting period renewal form (151 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 20 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS-PA 2.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 52,975 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (431 KB)
|
| Renewal Date | 09 Sep 20 (Renewable) (view history) info & rep check: concluded |
| Crediting Period (requested for renewal) |
25 Sep 19 - 24 Sep 26
Other crediting period(s): 25 Sep 12 - 24 Sep 19 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER calculation 5179
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: