18:53 18 May 25
Registration Request for Review Form
CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 3706 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Emissions reduction through partial substitution of fossil fuels with renewable plantation biomass and biomass residues in CEMEX Assiut Cement Plant |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1. The DOE is requested to explain how it has validated the following input values applied in the IRR calculation: (a) the fair value of zero during the 20 years of assessment period; (b) the clinker production quantity; and (c) the fuel substitution savings; the amount of heavy fuel oil replaced and the escalation rates applied for the 13 different types of biomass (such as corn cobs, cotton stalks, maize residues, rice straw, etc.) and materials (such as liquid waste, tyres, etc.) from year 1 to year 8. In doing so please refer to the VVM, v1.1, paragraphs 109 and 110. 2. The DOE shall further substantiate how the following parameters have been validated: (a) the specific energy consumption (SEC, kcal/kg-clinker) of the baseline as being conservative, (b) the installed capacity of the plant (t clinker/year) as the data shown in the PDD and spreadsheet calculations refer to historical production since 2006-2008 and there is reference to the actual plant installed capacity, (c) the grid emission factor calculation including the source of data and values of operating and build margins, and (d) leakage emission calculations considering that the PDD/VR say (p50, p24) that ‘the geographical boundary of the region will cover a radius around the project activity of 200 km (average transport distance = 400 km)’ while ACM0003 v7 (p20) states that the biomass procurement distance should not be more than 200 km by radius. In doing so please refer to equation 10, applicability criteria, and leakage emissions of the ACM0003 v7 and report the details such as values in the validation report. |
|
Date | 15 Dec 10 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: