Project 3213 : Gul Ahmed Combined Cycle Gas Turbine Project
Project title Gul Ahmed Combined Cycle Gas Turbine Project
- project design document (3624 KB)

PDD appendices
Appendix 1 - Att A - Gul Ahmed IRR calculation (58 KB)
Appendix 2 - Att B - Gul Ahmed IRR assumption (4287 KB)
Appendix 3 - Att C - Gul Ahmed stakeholders comments (926 KB)
Appendix 4 - Att D - Gul Ahmed withdrawal letter (98 KB)
Appendix 5 - Att E - Gul Ahmed internal benchmark IRR (1780 KB)
Appendix 6 - Att F - Gul Ahmed gas turbine acceptance test + boiler contract (483 KB)
Appendix 7 - Att G - Gul Ahmed GT contract of sale bet.pdf (43 KB)
Appendix 8 - Att H - Gul Ahmed EcoSecurities Pakistan Project Screening.pdf (22 KB)
Appendix 9 - Att I - Gul Ahmed revised carbon credit offer (exp 09Dec06).pdf (22 KB)
Appendix 10 - Att J - Gul Ahmed 27 Sept 2006 initial offer email and attachment (936 KB)
Appendix 11 - Att K - Gul Ahmed WHRB first trial operat.pdf (157 KB)
Appendix 12 - Att L - Gul Ahmed Pakistan external benchmark v6 12.08.09 (AV) (831 KB)
Appendix 13 - Att M - Gul Ahmed ER calculations v04 10.12.09 fixed (90 KB)


- registration request form (53 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties Pakistan , involved indirectly approval (1961 KB) authorization (1961 KB)
Authorized Participants: Gul Ahmed Textiles Mills Limited
Other Parties Involved United Kingdom of Great Britain and Northern Ireland , involved indirectly approval (100 KB) authorization (100 KB)
Authorized Participants: EcoSecurities International Limited
Sectoral scopes 3 : Energy demand
4 : Manufacturing industries
Activity Scale SMALL
Methodologies Used AMS-II.D. ver. 11 - Energy efficiency and fuel switching measures for industrial facilities
Standardized baselines used N/A
Amount of Reductions 35,656 metric tonnes CO2 equivalent per annum
Fee level USD 5631.2
Validation Report Validation report (1228 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 23/11/2012
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 02/12/2019
Registration Date 09 Nov 10   (view history)  
Crediting Period 09 Nov 10 - 08 Nov 17 (Renewable - Expired)
Renewal no longer possible
Requests for Issuance
and related documentation