Project: 2599 Huaneng Tongliao Baolongshan Phase II Wind Farm Project - Crediting Period Renewal Request
[]
Project 2599: Huaneng Tongliao Baolongshan Phase II Wind Farm Project

- project design document (963 KB)

PDD appendices
Appendix 1 - Huaneng Tongliao Baolongshan Phase II-ER (63 KB)

- crediting period renewal form (111 KB)
Methodologies Used ACM0002 ver. 17 - Grid-connected electricity generation from renewable sources
VVS Version VVS 9.0
Standardized baselines used N/A
Amount of Reductions 115,060 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (568 KB)
Renewal Date 12 Sep 17 (Renewable - Expired)   (view history)   completeness check: complete info & rep check: concluded
Renewal no longer possible
Crediting Period (requested for renewal) 19 Dec 16 - 18 Dec 23

Other crediting period(s): 19 Dec 09 - 18 Dec 16
Requests for Issuance
and related documentation