Project title of the project activity or programme of activities (PoA) for which issuance is requested | 25.6 MW grid connected Wind Power based electricity generation project in Karnataka, India. (2474) |
---|---|
DOE that requested for issuance and date of request | TÜV NORD (11 Dec 10) |
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review | |
Incompetence | |
Please indicate reasons for the request for review | |
The monitoring plan (p32) illustrates that “WTGs of other investor” are connected to the outlet of the substation. However, the monitoring report (p.6) shows that “WTGs of other investor” are connected to the inlet of the 33/220kV substation. As a consequence, an apportionment of the transmission loss is used in the calculation in the monitoring report, which was not in line with the PDD. The DOE is required to clarify how the DOE verified the monitoring of the net electricity delivered to the grid as per the approved monitoring plan. | |
Date | 12 Mar 11 |