05:56 27 Aug 26
Project
2026 :
5.8 MW Wind Energy Generation by M/s Patspin India Limited.
| Project title |
5.8 MW Wind Energy Generation by M/s Patspin India Limited.
- project design document (583 KB)
PDD appendices Appendix 1 - Board Minutes PAT SPIN (140 KB)
Appendix 2 - IRR Calculations 1PAT SPIN (309 KB)
Appendix 3 - IRR Calculations 2 PAT SPIN (305 KB)
Appendix 4 - IRR Calculations 3 PAT SPIN (309 KB)
Appendix 5 - IRR Calculations 4 PAT SPIN (311 KB)
Appendix 6 - CER Calcualtions GPIL (20 KB)
- registration request form (105 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
India
, involved indirectly
approval (25 KB)
authorization (25 KB)
Authorized Participants: M/s Patspin India Limited |
| Other Parties Involved |
United Kingdom of Great Britain and Northern Ireland
, involved indirectly
approval (35 KB)
authorization (35 KB)
Authorized Participants: Cantor Fitzgerald Europe |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | SMALL |
| Methodologies Used |
AMS-I.D. ver. 12 -
Grid connected renewable electricity generation
|
| Standardized baselines used | N/A |
| Amount of Reductions | 12,975 metric tonnes CO2 equivalent per annum |
| Fee level | USD 0.0 |
| Validation Report |
Validation report (1548 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication | |
| Registration Date | 11 Dec 08 (view history) |
| Crediting Period | 11 Dec 08 - 10 Dec 18 (Fixed) |
| Requests for Issuance
and related documentation |
Monitoring report: 11 Dec 2008 - 15 May 2010 (131 KB)Issuance request state: Issued CERs requested up to 31 December 2012: 16049 Serial Range: Block start: IN-5-119137503-1-1-0-2026 Block end: IN-5-119153551-1-1-0-2026 [Full view and history] |

project design document
Appendix 2 - IRR Calculations 1PAT SPIN
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: