20:12 07 Nov 26
Project
1239 :
1.25 MW biomass based captive power plant by UP Asbestos Limited at Lucknow
| Project title |
1.25 MW biomass based captive power plant by UP Asbestos Limited at Lucknow
- project design document (2564 KB)
PDD appendices Appendix 1 - UPAL Emission Reduction Calculation (39 KB)
Appendix 2 - UPAL IRR Certificate (264 KB)
- registration request form (171 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
India
, involved indirectly
approval (172 KB)
authorization (172 KB)
Authorized Participants: M/s UP Asbestos Limited |
| Other Parties Involved | n/a |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | SMALL |
| Methodologies Used |
AMS-I.C. ver. 9 -
Thermal energy for the user
|
| Standardized baselines used | N/A |
| Amount of Reductions | 6,225 metric tonnes CO2 equivalent per annum |
| Fee level | USD 0.0 |
| Validation Report |
Validation report (966 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
Modalities of Communication valid as of 02/05/2012 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 12/10/2010 |
| Registration Date | 22 Sep 07 (view history) |
| Crediting Period |
22 Sep 07 - 21 Sep 14
(Renewable - Expired)
Renewal no longer possible
|
| Requests for Issuance
and related documentation |
Monitoring report: 22 Sep 2007 - 31 Mar 2009 (128 KB)Issuance request state: Awaiting issuance request [Full view and history] |

project design document
Appendix 1 - UPAL Emission Reduction Calculation
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: