03:16 02 Jan 26
Project
3545 :
Yanapampa Hydroelectric Power Plant
| Project title |
Yanapampa Hydroelectric Power Plant
- project design document (933 KB)
PDD appendices Appendix 1 - Operating margin Calculation (29 MB)
Appendix 2 - Build Margin Calculation (42 KB)
Appendix 3 - Emission Reductions Calculation (25 KB)
Appendix 4 - Deuman SL Withdrawal Letter (39 KB)
Appendix 5 - Yanapampa acceptance of Deuman Withdrawal (510 KB)
Appendix 6 - Yanapamapa IRR Calculation spreadsheet (152 KB)
- registration request form (211 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
Peru
, involved indirectly
approval (139 KB)
authorization (139 KB)
Authorized Participants: Electrica Yanapampa S.A.C. |
| Other Parties Involved | n/a |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | SMALL |
| Methodologies Used |
AMS-I.D. ver. 13 -
Grid connected renewable electricity generation
|
| Standardized baselines used | N/A |
| Amount of Reductions | 29,690 metric tonnes CO2 equivalent per annum |
| Fee level | USD 4438.0 |
| Validation Report |
Validation report (1538 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 26/04/2012 |
| Registration Date | 18 Dec 10 (view history) |
| Crediting Period |
01 Jun 11 - 31 May 18
(Renewable - Expired)
Renewal no longer possible
|
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - Operating margin Calculation
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: