22:23 01 Nov 25
PoA
8674 :
Philippines Mini-Hydro PoA.
| PoA title |
Philippines Mini-Hydro PoA.
- POA design document (1037 KB)
- POA registration request form (124 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| CPAs |
-
CPA design document (433 KB)
Initially submitted at the time of requesting registration of the POA: - CPA-1: Carit-an Mini-Hydropower Plant under Philippines Mini-Hydro PoA (view all CPAs) |
| Host Parties |
Philippines
, involved indirectly
approval (145 KB)
|
| Other Parties Involved |
Germany
, involved indirectly
approval (929 KB)
authorization (929 KB)
Authorized Participants: Kreditanstalt für Wiederaufbau (KfW) (withdrawn) |
| Coordinating/Managing Entity |
Land Bank of the Philippines (LBP)
|
| DOE | TUV RHEIN |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | SMALL |
| Methodology Used |
AMS-I.D. ver. 17 -
Grid connected renewable electricity generation
|
| Standardized baselines used | N/A |
| VVS Version | |
| Amount of Reductions (PoA) | 2,000 metric tonnes CO2 equivalent per annum |
| Amount of Reductions (Initial CPAs) | 2,000 metric tonnes CO2 equivalent per annum |
| Fee level | USD 0.0 |
| Validation Report |
Validation report (2359 KB)
Public availability information Link to information uploaded for public availability |
| Modalities of Communication |
Modalities of Communication valid as of 02/07/2013 MoC Annex 2 (Withdraw Project Participant) valid as of 01/07/2013 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 01/07/2013 |
| Registration Date | 11 Dec 12 |
| Renewal Period | 11 Dec 12 - 10 Dec 19 |
| PoA Duration | 01 Oct 11 - 30 Sep 39 |
| Requests for Issuance
and related documentation |
|

POA design document
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: