PoA 8486 : Biomass residues power generation Programme
PoA title Biomass residues power generation Programme
- POA design document (1702 KB)

PoA DD appendices at the time of registration
Appendix 1 - Emission Reductions (346 KB)


- POA registration request form (399 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
CPAs

Initially submitted at the time of requesting registration of the POA:
- Amatikulu CPA - Renewable Energy Generation Facility

(view all CPAs)
Host Parties South Africa , involved indirectly approval (872 KB) authorization (872 KB)
Authorized Participants: Standard Bank Plc (withdrawn as of 4/5/2016) ; Additional Energy Ltd.
Other Parties Involved n/a
Coordinating/Managing Entity Additional Energy Ltd.
DOE JCI
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale LARGE
Methodology Used ACM0006 ver. 12 - Consolidated methodology for electricity and heat generation from biomass
Standardized baselines used N/A
VVS Version
Amount of Reductions (PoA) 269,952 metric tonnes CO2 equivalent per annum
Amount of Reductions (Initial CPAs) 269,952 metric tonnes CO2 equivalent per annum
Fee level USD 52490.4
Validation Report Validation report (2266 KB)
Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 13/04/2016

MoC Annex 2 (Withdraw Project Participant) valid as of 04/05/2016
MoC Annex 2 (Add Project Participant) valid as of 13/04/2016
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 08/04/2016
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 17/11/2015
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 11/06/2015
CME confirmation: 8486_CME_FORM (85 KB)
Registration Date 03 Mar 14  
Renewal Period 03 Mar 14 - 02 Mar 21
PoA Duration 14 Jul 12 - 13 Jul 40
Requests for Issuance
and related documentation