08:13 04 May 24
PoA
8526 :
Renewable energy utilization in the new and existing buildings in Henan Province
PoA title |
Renewable energy utilization in the new and existing buildings in Henan Province
- POA design document (869 KB) - POA registration request form (121 KB) |
---|---|
SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
CPAs |
-
CPA design document (430 KB)
Initially submitted at the time of requesting registration of the POA: - Renewable energy utilization in Tianruanjiacheng Phase I (CPA identification number:2011_F_CDM_0001) (view all CPAs) |
Host Parties |
China
, involved indirectly
approval (1698 KB)
authorization (1698 KB)
Authorized Participants: Henan Provincial Academy of Building Research (HABR) |
Other Parties Involved |
United Kingdom of Great Britain and Northern Ireland
, involved indirectly
approval (45 KB)
authorization (45 KB)
Authorized Participants: Deutsche Bank AG, London Branch (withdrawn) |
Coordinating/Managing Entity |
Henan Provincial Academy of Building Research (HABR)
|
DOE | TUV RHEIN |
Sectoral scopes |
1 : Energy industries (renewable - / non-renewable sources)
3 : Energy demand |
Activity Scale | SMALL |
Methodology Used |
AMS-I.C. ver. 19 -
Thermal energy production with or without electricity
AMS-II.C. ver. 13 - Demand-side energy efficiency activities for specific technologies |
Standardized baselines used | N/A |
VVS Version | |
Amount of Reductions (PoA) | 896 metric tonnes CO2 equivalent per annum |
Amount of Reductions (Initial CPAs) | 896 metric tonnes CO2 equivalent per annum |
Fee level | USD 0.0 |
Validation Report |
Validation report (2353 KB)
Public availability information Link to information uploaded for public availability |
Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 05/07/2013 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 12/08/2020 MoC Annex 2 (Withdraw Project Participant) valid as of 04/07/2013 |
Registration Date | 04 Dec 12 |
Renewal Period |
04 Dec 12
-
03 Dec 19
Other period(s): 04 Dec 19 - 03 Dec 26 |
PoA Duration | 01 Jan 11 - 31 Dec 38 |
Requests for Issuance
and related documentation |
|
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: