16:58 14 Mar 26
PoA
8188 :
Shinsung Solar Energy Grid Connected Photovoltaic Power Generation PoA
| PoA title |
Shinsung Solar Energy Grid Connected Photovoltaic Power Generation PoA
- POA design document (1200 KB)
- POA registration request form (262 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| CPAs |
Initially submitted at the time of requesting registration of the POA: - CPA [01] Jeungpyeong Grid Connected Photovoltaic Power Generation Project (view all CPAs) |
| Host Parties |
Republic of Korea
, involved indirectly
approval (1481 KB)
authorization (1481 KB)
Authorized Participants: Shinsung ENG Co., Ltd. ; Shinsung Solar Energy Co., Ltd. (withdrawn as of 04/07/2022) |
| Other Parties Involved | n/a |
| Coordinating/Managing Entity |
Shinsung ENG Co., Ltd.
|
| DOE | DTSUS |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | SMALL |
| Methodology Used |
AMS-I.D. ver. 17 -
Grid connected renewable electricity generation
|
| Standardized baselines used | N/A |
| VVS Version | |
| Amount of Reductions (PoA) | 78 metric tonnes CO2 equivalent per annum |
| Amount of Reductions (Initial CPAs) | 78 metric tonnes CO2 equivalent per annum |
| Fee level | USD 0.0 |
| Validation Report |
Validation report (912 KB)
Public availability information Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 13/04/2022 MoC Annex 2 (Withdraw Project Participant (Administrative)) valid as of 04/07/2022 |
| Registration Date | 13 Nov 12 |
| Renewal Period |
13 Nov 12
-
12 Nov 19
Other period(s): 13 Nov 19 - 12 Nov 26 |
| PoA Duration | 15 Feb 12 - 14 Feb 40 |
| Requests for Issuance
and related documentation |
|

POA design document
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: