09:10 27 Nov 24
PoA
5997 :
Standard Bank Low Pressure Solar Water Heater Programme for South Africa
PoA title |
Standard Bank Low Pressure Solar Water Heater Programme for South Africa
- POA design document (581 KB) PoA DD appendices at the time of registration Appendix 1 - Appendix to POA (142 KB) - POA registration request form (1043 KB) |
---|---|
SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
CPAs |
-
CPA design document (188 KB)
Initially submitted at the time of requesting registration of the POA: - Standard Bank Low Pressure Solar Water Heater Programme for South Africa – CPA-001 (view all CPAs) |
Host Parties |
South Africa
, involved indirectly
approval (1191 KB)
authorization (1191 KB)
Authorized Participants: Standard Bank of South Africa Ltd (withdrawn as of 01/07/2016) ; I Carbon (Pty) Ltd ; Low E Solutions Pty Ltd |
Other Parties Involved |
United Kingdom of Great Britain and Northern Ireland
, involved indirectly
approval (45 KB)
authorization (45 KB)
Authorized Participants: Standard Bank Plc (withdrawn as of 01/07/2016) |
Coordinating/Managing Entity |
Low E Solutions Pty Ltd.
|
DOE | JCI |
Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
Activity Scale | SMALL |
Methodology Used |
AMS-I.C. ver. 19 -
Thermal energy production with or without electricity
|
Standardized baselines used | N/A |
VVS Version | |
Amount of Reductions (PoA) | 39,266 metric tonnes CO2 equivalent per annum |
Amount of Reductions (Initial CPAs) | 39,266 metric tonnes CO2 equivalent per annum |
Fee level | USD 6353.2 |
Validation Report |
Validation report (2274 KB)
Public availability information Link to information uploaded for public availability |
Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 02/05/2016 MoC Annex 2 (Withdraw Project Participant) valid as of 01/07/2016 MoC Annex 2 (Withdraw Project Participant) valid as of 01/07/2016 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 02/05/2016 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 02/05/2016 MoC Annex 2 (Add Project Participant) valid as of 16/02/2016 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 17/11/2015 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 18/06/2015 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 04/06/2013 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 06/05/2013 |
Registration Date | 24 Apr 12 |
Renewal Period | 24 Apr 12 - 23 Apr 19 |
PoA Duration | 04 Jan 11 - 03 Jan 39 |
Requests for Issuance
and related documentation |
|
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: