09:20 27 Nov 24
PoA
9423 :
Micro Hydro Power Plant Promotion Programme in Regions on the Upper Reaches of the Yangtze River, China (Micro Hydro Power Plant Promotion Programme in Forest Regions of Liangshan Prefecture, Sichuan Province)
PoA title |
Micro Hydro Power Plant Promotion Programme in Regions on the Upper Reaches of the Yangtze River, China (Micro Hydro Power Plant Promotion Programme in Forest Regions of Liangshan Prefecture, Sichuan Province)
- POA design document (8114 KB) PoA DD appendices at the time of registration Appendix 1 - Micro Hydro_Val_Report_ver03 tracked (721 KB) - POA registration request form (161 KB) |
---|---|
SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
CPAs |
Initially submitted at the time of requesting registration of the POA: - Micro Hydro Power Plant Promotion Programme in Sichuan Shenguozhuang Giant Panda Nature Reserve Surrounding (CPA-01) (view all CPAs) |
Host Parties |
China
, involved indirectly
approval (471 KB)
|
Other Parties Involved |
Japan
, involved indirectly
approval (3208 KB)
authorization (3208 KB)
Authorized Participants: PEAR Carbon Offset Initiative, Ltd. |
Coordinating/Managing Entity |
Junenghuili Carbon Capital Management (Beijing) Co., Ltd.
|
DOE | JCI |
Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
Activity Scale | SMALL |
Methodology Used |
AMS-I.E. ver. 5 -
Switch from non-renewable biomass for thermal applications by the user
|
Standardized baselines used | N/A |
VVS Version | |
Amount of Reductions (PoA) | 848 metric tonnes CO2 equivalent per annum |
Amount of Reductions (Initial CPAs) | 848 metric tonnes CO2 equivalent per annum |
Fee level | USD 0.0 |
Validation Report |
Validation report (815 KB)
Public availability information Link to information uploaded for public availability |
Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 04/09/2014 |
Registration Date | 17 Jan 14 |
Renewal Period | 17 Jan 14 - 16 Jan 21 |
PoA Duration | 26 May 11 - 25 May 39 |
Requests for Issuance
and related documentation |
|
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: