22:52 13 Nov 25
PoA
6337 :
Installing Solar Water Heating Systems in the South of Viet Nam
| PoA title |
Installing Solar Water Heating Systems in the South of Viet Nam
- POA design document (355 KB)
PoA DD appendices at the time of registration Appendix 1 - Appendix of PoA DD (SOP PoA) (77 KB)
Appendix 2 - Appendix of PoA DD (SWHPOA-DATA) (28 KB)
- POA registration request form (95 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| CPAs |
-
CPA design document (253 KB)
Initially submitted at the time of requesting registration of the POA: - Installing Solar Water Heating Systems in the South of Viet Nam - 1 (view all CPAs) |
| Host Parties |
Viet Nam
, involved indirectly
approval (747 KB)
|
| Other Parties Involved |
Japan
, involved indirectly
approval (26 KB)
authorization (26 KB)
Authorized Participants: Mitsubishi UFJ Morgan Stanley Securities Co., Ltd. |
| Coordinating/Managing Entity |
The Energy Conservation Center of Ho Chi Minh City
|
| DOE | JQA |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | SMALL |
| Methodology Used |
AMS-I.J. -
Solar water heating systems (SWH)
|
| Standardized baselines used | N/A |
| VVS Version | |
| Amount of Reductions (PoA) | 57 metric tonnes CO2 equivalent per annum |
| Amount of Reductions (Initial CPAs) | 57 metric tonnes CO2 equivalent per annum |
| Fee level | USD 0.0 |
| Validation Report |
Validation report (1338 KB)
Public availability information Link to information uploaded for public availability |
| Modalities of Communication |
|
| Registration Date | 08 Jun 12 |
| Renewal Period | 08 Jun 12 - 07 Jun 19 |
| PoA Duration | 09 Nov 09 - 08 Nov 37 |
| Requests for Issuance
and related documentation |
|

POA design document
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: