16:23 25 Nov 24
PoA
6584 :
The programme to introduce renewable energy system into Jeju Island
PoA title |
The programme to introduce renewable energy system into Jeju Island
- POA design document (1305 KB) - POA registration request form (177 KB) |
---|---|
SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
CPAs |
-
CPA design document (850 KB)
Initially submitted at the time of requesting registration of the POA: - The programme to introduce renewable energy system into Jeju Island – CPA No.001 (2011, JGP) (view all CPAs) |
Host Parties |
Republic of Korea
, involved indirectly
approval (588 KB)
authorization (588 KB)
Authorized Participants: Ecoeye Co.,Ltd |
Other Parties Involved | n/a |
Coordinating/Managing Entity |
Jeju Special Self-Governing Province
|
DOE | KECO |
Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
Activity Scale | SMALL |
Methodology Used |
AMS-I.F. ver. 2 -
Renewable electricity generation for captive use and mini-grid
AMS-I.D. ver. 17 - Grid connected renewable electricity generation |
Standardized baselines used | N/A |
VVS Version | |
Amount of Reductions (PoA) | 863 metric tonnes CO2 equivalent per annum |
Amount of Reductions (Initial CPAs) | 863 metric tonnes CO2 equivalent per annum |
Fee level | USD 0.0 |
Validation Report |
Validation report (1838 KB)
Public availability information Link to information uploaded for public availability |
Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 25/09/2012 |
Registration Date | 04 Jul 12 |
Renewal Period | 04 Jul 12 - 03 Jul 19 |
PoA Duration | 02 May 11 - 01 May 39 |
Requests for Issuance
and related documentation |
|
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: