16:24 25 Nov 24
PoA
9497 :
Southern African Solar LED Programme
PoA title |
Southern African Solar LED Programme
- POA design document (733 KB) PoA DD appendices at the time of registration Appendix 1 - The-status-of-paraffin-appliances-in-South-Africa_-_PSASA (186 KB) - POA registration request form (189 KB) |
---|---|
SDC description report |
Report(s): |
CPAs |
-
CPA design document (294 KB)
Initially submitted at the time of requesting registration of the POA: - Southern African Solar LED Programme – South Africa CPA (view all CPAs) |
Host Parties |
South Africa
, involved indirectly
approval (442 KB)
authorization (442 KB)
Authorized Participants: ToughStuff International Ltd. (withdrawn) Namibia , involved indirectly approval (1288 KB) Zambia , involved indirectly approval (214 KB) |
Other Parties Involved | n/a |
Coordinating/Managing Entity |
Tough Stuff International Ltd
|
DOE | BVI |
Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
Activity Scale | SMALL |
Methodology Used |
AMS-III.AR. ver. 3 -
Substituting fossil fuel based lighting with LED/CFL lighting systems
|
Standardized baselines used | N/A |
VVS Version | |
Amount of Reductions (PoA) | 12,236 metric tonnes CO2 equivalent per annum |
Amount of Reductions (Initial CPAs) | 12,236 metric tonnes CO2 equivalent per annum |
Fee level | USD 0.0 |
Validation Report |
Validation report (2227 KB)
Public availability information Link to information uploaded for public availability |
Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 05/11/2013 MoC Annex 2 (Withdraw Project Participant) valid as of 28/01/2015 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 26/01/2015 |
Registration Date | 31 Dec 12 |
Renewal Period | 31 Dec 12 - 30 Dec 19 |
PoA Duration | 22 Jan 12 - 21 Jan 40 |
Requests for Issuance
and related documentation |
|
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: