PoA 7191 : Enlightened Solar PoA
PoA title Enlightened Solar PoA
- POA design document (1063 KB)

PoA DD appendices at the time of registration
Appendix 1 - Emission Factor calculation sheet - Enlightened.xls (273 KB)


- POA registration request form (164 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
CPAs - CPA design document (247 KB)

Initially submitted at the time of requesting registration of the POA:
- Enlightened Solar PoA- CPA- 001

(view all CPAs)
Host Parties Israel , involved indirectly approval (25 KB)
Other Parties Involved Sweden , involved indirectly approval (365 KB) authorization (365 KB)
Authorized Participants: Tricorona Carbon Asset Management Pte Ltd
Coordinating/Managing Entity Tricorona Carbon Asset Management Pte Ltd
DOE BVI
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale SMALL
Methodology Used AMS-I.D. ver. 17 - Grid connected renewable electricity generation
Standardized baselines used N/A
VVS Version
Amount of Reductions (PoA) 3,043 metric tonnes CO2 equivalent per annum
Amount of Reductions (Initial CPAs) 3,043 metric tonnes CO2 equivalent per annum
Fee level USD 0.0
Validation Report Validation report (574 KB)
Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 19/11/2013

MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 04/09/2013
Registration Date 04 Sep 12  
Renewal Period 04 Sep 12 - 03 Sep 19
PoA Duration 01 Oct 12 - 30 Sep 40
Requests for Issuance
and related documentation