PoA 7893 : Standard Bank MSW Composting Programme
PoA title Standard Bank MSW Composting Programme
- POA design document (2070 KB)

- POA registration request form (161 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
CPAs

Initially submitted at the time of requesting registration of the POA:
- CPA001 Kumasi Composting Plant at Adagya

(view all CPAs)
Host Parties Ghana , involved indirectly approval (504 KB) authorization (504 KB)
Authorized Participants: Standard Bank plc (withdrawn as of 22/02/2019) ; Additional Energy Limited
Other Parties Involved n/a
Coordinating/Managing Entity Additional Energy Limited
DOE JCI
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
13 : Waste handling and disposal
Activity Scale LARGE
Methodology Used AM0025 ver. 13 - Avoided emissions from organic waste through alternative waste treatment processes
Standardized baselines used N/A
VVS Version
Amount of Reductions (PoA) 27,889 metric tonnes CO2 equivalent per annum
Amount of Reductions (Initial CPAs) 27,889 metric tonnes CO2 equivalent per annum
Fee level USD 4077.8 (deferred)
Validation Report Validation report (2083 KB)
Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 15/02/2019

MoC Annex 2 (Withdraw Project Participant (Voluntary)) valid as of 22/02/2019
MoC Annex 2 (Add Project Participant) valid as of 01/02/2019
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 06/04/2016
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 17/11/2015
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 15/06/2015
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 03/06/2013
Registration Date 21 Dec 12  
Renewal Period 21 Dec 12 - 20 Dec 19
PoA Duration 25 Apr 12 - 24 Apr 40
Requests for Issuance
and related documentation