11:02 14 Nov 25
PoA
9431 :
Chilean Programme of Activities for integrated Non Conventional Renewable Energies
| PoA title |
Chilean Programme of Activities for integrated Non Conventional Renewable Energies
- POA design document (1132 KB)
PoA DD appendices at the time of registration Appendix 1 - EF SING (4328 KB)
Appendix 2 - EF-SIC (1319 KB)
- POA registration request form (74 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| CPAs |
-
CPA design document (411 KB)
Initially submitted at the time of requesting registration of the POA: - Sol del Loa Photovoltaic Power Plant Project (Proyecto Central Fotovoltáica Sol del Loa) CPA Serial Number 001 (view all CPAs) |
| Host Parties |
Chile
, involved indirectly
approval (1665 KB)
authorization (1665 KB)
Authorized Participants: Carbon Capital Inc. & Cia. SpA. |
| Other Parties Involved | n/a |
| Coordinating/Managing Entity |
Carbon Capital Inc. & Cia. Ltda.
|
| DOE | Carbon Check |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | LARGE |
| Methodology Used |
ACM0002 ver. 12 -
Consolidated baseline methodology for grid-connected electricity generation from renewable sources
|
| Standardized baselines used | N/A |
| VVS Version | |
| Amount of Reductions (PoA) | 191,134 metric tonnes CO2 equivalent per annum |
| Amount of Reductions (Initial CPAs) | 191,134 metric tonnes CO2 equivalent per annum |
| Fee level | USD 36726.8 |
| Validation Report |
Validation report (1960 KB)
Public availability information Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 09/01/2014 |
| Registration Date | 31 Dec 12 |
| Renewal Period | 31 Dec 12 - 30 Dec 19 |
| PoA Duration | 01 Mar 13 - 28 Feb 41 |
| Requests for Issuance
and related documentation |
|

POA design document
Appendix 1 - EF SING
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: