16:45 25 Nov 24
PoA
9217 :
AeroPod Composting and Co-composting Programme in Malaysia.
PoA title |
AeroPod Composting and Co-composting Programme in Malaysia.
- POA design document (1235 KB) - POA registration request form (93 KB) |
---|---|
SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
CPAs |
-
CPA design document (920 KB)
Initially submitted at the time of requesting registration of the POA: - AeroPod Co-composting Programme for Silimpopon Mill in Sabah (view all CPAs) |
Host Parties |
Malaysia
, involved indirectly
approval (29 KB)
authorization (29 KB)
Authorized Participants: Natural Objective Sdn Bhd |
Other Parties Involved |
Netherlands
, involved indirectly
approval (145 KB)
authorization (145 KB)
Authorized Participants: Carbon Partners Asiatica (Hong Kong) Co. Ltd. |
Coordinating/Managing Entity |
Natural Objective Sdn Bhd
|
DOE | TUV RHEIN |
Sectoral scopes | 13 : Waste handling and disposal |
Activity Scale | SMALL |
Methodology Used |
AMS-III.F. ver. 10 -
Avoidance of methane emissions through composting
|
Standardized baselines used | N/A |
VVS Version | |
Amount of Reductions (PoA) | 16,681 metric tonnes CO2 equivalent per annum |
Amount of Reductions (Initial CPAs) | 16,681 metric tonnes CO2 equivalent per annum |
Fee level | USD 1836.2 |
Validation Report |
Validation report (3081 KB)
Public availability information Link to information uploaded for public availability |
Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 17/07/2014 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 24/07/2014 |
Registration Date | 27 Dec 12 |
Renewal Period | 27 Dec 12 - 26 Dec 19 |
PoA Duration | 20 Apr 12 - 19 Apr 40 |
Requests for Issuance
and related documentation |
|
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: