PoA 7699 : Hot Water Heating Programme for South Africa
PoA title Hot Water Heating Programme for South Africa
- POA design document (730 KB)

- POA registration request form (126 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
CPAs

Initially submitted at the time of requesting registration of the POA:
- Hot Water Heating Programme for South Africa - CPA001

(view all CPAs)
Host Parties South Africa , involved indirectly approval (1650 KB) authorization (1650 KB)
Authorized Participants: I Carbon (Pty) Ltd. ; Low E Solutions (Pty) Ltd ; Standard Bank Plc (withdrawn as of 14/09/2017)
Other Parties Involved Liechtenstein , involved indirectly approval (1405 KB) authorization (1405 KB)
Authorized Participants: International Carbon Ltd
Coordinating/Managing Entity Low E Solutions (Pty) Ltd.
DOE DNV
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
3 : Energy demand
Activity Scale SMALL
Methodology Used AMS-I.C. ver. 19 - Thermal energy production with or without electricity
AMS-II.C. ver. 13 - Demand-side energy efficiency activities for specific technologies
Standardized baselines used N/A
VVS Version
Amount of Reductions (PoA) 12,084 metric tonnes CO2 equivalent per annum
Amount of Reductions (Initial CPAs) 12,084 metric tonnes CO2 equivalent per annum
Fee level USD 0.0
Validation Report Validation report (1677 KB)
Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 14/08/2017

MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 25/09/2017
MoC Annex 2 (Withdraw Project Participant (Voluntary)) valid as of 14/09/2017
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 02/05/2016
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 13/01/2016
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 15/06/2015
MoC Annex 2 (Add Project Participant) valid as of 18/03/2014
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 18/03/2014
CME confirmation: Untitled (uploaded 14 Aug 17 12:58:34) (46 KB)
Registration Date 15 Oct 12  
Renewal Period 15 Oct 12 - 14 Oct 19
PoA Duration 12 Feb 12 - 11 Feb 40
Requests for Issuance
and related documentation