18:01 28 Dec 24
CPA
5324-P1-0012-CP1 :
Dak U Hydropower Project
PoA | 5324: Than Thien Small Hydropower Programme of Activities Managed by INTRACO |
---|---|
CPA |
Dak U Hydropower Project
cpa design document (1073 KB) Additional documents for this specific CPA Appendix 1 - Dak U_ER sheet (52 KB) Appendix 2 - Dak U_IRR Calculation (116 KB) Appendix 3 - FVR CPA_Dak_U (1058 KB) Additional inclusion documents CPA inclusion form (39 KB) |
Host Parties | Viet Nam |
Amount of Reductions | 5,986 metric tonnes CO2 equivalent per annum |
Crediting Period | 01 Aug 2013 - 31 Jul 2023 (Fixed) |
Inclusion date | 05 Jul 2013 (view inclusion) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: