12:00 27 Nov 24
CPA
9502-P2-0003-CP2 :
9.13 MW Solar Power Project by KRBL Limited: CPA S003
[]
PoA | 9502: PoA on RE |
---|---|
CPA |
9.13 MW Solar Power Project by KRBL Limited: CPA S003
cpa design document (868 KB) Additional documents for this specific CPA Appendix 1 - ER CPA S003 BELL_CDM_CPA_PoA_RCP_19622 (27 KB) Appendix 2 - FVR CPA S003 BELL_CDM_CPA_PoA_RCP_19622 (248 KB) Additional renewal documents CPA renewal form (76 KB) |
Host Parties | India |
Amount of Reductions | 13,463 metric tonnes CO2 equivalent per annum |
Crediting Period |
01 Oct 2021
-
30 Sep 2028
(Renewable)
Other period(s): 01 Oct 14 - 30 Sep 21 |
Renewal date | 30 Sep 2022 Provisional (awaiting guidance from the CMP at CMP 16) (view renewal) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: