CPA 10307-P1-0004-CP1 : Solehdokal Small Scale Hydro Power
PoA 10307: Small Hydro Power Programme of Activities in Iran
CPA Solehdokal Small Scale Hydro Power
cpa design document (865 KB)

Additional documents for this specific CPA
Appendix 1 - CCIPL 382_FVR_CPA-Solehdokal_clean (1847 KB)
Appendix 2 - Soleh dokal ER calculation (1374 KB)
Appendix 3 - CCIPL 382_FVR_CPA-Solehdokal_tc (1850 KB)
Appendix 4 - Solehdokal-CPA-DD_TC (867 KB)

Additional inclusion documents
CPA inclusion form (1148 KB)
Host Parties Iran (Islamic Republic of)
Amount of Reductions 12,090 metric tonnes CO2 equivalent per annum
Crediting Period 01 Apr 2017 - 31 Mar 2024 (Renewable)
Inclusion date 09 Mar 2017 (submitted at the time of requesting registration of the PoA)