CPA 5758-P1-0001-CP1 : Bera 10MW Biomass Power Plant, Bera, Pahang (3.2750;102.5508 – PoA1)
PoA 5758: Malaysia Biomass Power Plant Project
CPA Bera 10MW Biomass Power Plant, Bera, Pahang (3.2750;102.5508 – PoA1)
cpa design document (1344 KB)

Additional documents for this specific CPA
Appendix 1 - CPA Validation Report_Rev.2_Ref. PDD V.2_061212.pdf (1257 KB)
Appendix 2 - CPA-DD-Bera ER Cost Analysis - ACM0018 (ver 2.3) 06122012.xlsx (41 KB)
Appendix 3 - CPA-DD-Bera ER Tabulation - ACM0018 (ver 2.3) 06122012.xlsx (38 KB)

Additional inclusion documents
CPA inclusion form (349 KB)
Host Parties Malaysia
Amount of Reductions 123,449 metric tonnes CO2 equivalent per annum
Crediting Period 01 Jun 2013 - 31 May 2023 (Fixed)
Inclusion date 12 Dec 2012 (submitted at the time of requesting registration of the PoA)