20:06 23 Nov 24
CPA
5758-P1-0001-CP1 :
Bera 10MW Biomass Power Plant, Bera, Pahang (3.2750;102.5508 – PoA1)
PoA | 5758: Malaysia Biomass Power Plant Project |
---|---|
CPA |
Bera 10MW Biomass Power Plant, Bera, Pahang (3.2750;102.5508 – PoA1)
cpa design document (1344 KB) Additional documents for this specific CPA Appendix 1 - CPA Validation Report_Rev.2_Ref. PDD V.2_061212.pdf (1257 KB) Appendix 2 - CPA-DD-Bera ER Cost Analysis - ACM0018 (ver 2.3) 06122012.xlsx (41 KB) Appendix 3 - CPA-DD-Bera ER Tabulation - ACM0018 (ver 2.3) 06122012.xlsx (38 KB) Additional inclusion documents CPA inclusion form (349 KB) |
Host Parties | Malaysia |
Amount of Reductions | 123,449 metric tonnes CO2 equivalent per annum |
Crediting Period | 01 Jun 2013 - 31 May 2023 (Fixed) |
Inclusion date | 12 Dec 2012 (submitted at the time of requesting registration of the PoA) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: