13:10 14 Nov 25
CPA
5758-P1-0001-CP1 :
Bera 10MW Biomass Power Plant, Bera, Pahang (3.2750;102.5508 – PoA1)
| PoA | 5758: Malaysia Biomass Power Plant Project |
|---|---|
| CPA |
Bera 10MW Biomass Power Plant, Bera, Pahang (3.2750;102.5508 – PoA1)
cpa design document (1344 KB)
Additional documents for this specific CPA Appendix 1 - CPA Validation Report_Rev.2_Ref. PDD V.2_061212.pdf (1257 KB)
Appendix 2 - CPA-DD-Bera ER Cost Analysis - ACM0018 (ver 2.3) 06122012.xlsx (41 KB)
Appendix 3 - CPA-DD-Bera ER Tabulation - ACM0018 (ver 2.3) 06122012.xlsx (38 KB)
Additional inclusion documents CPA inclusion form (349 KB)
|
| Host Parties | Malaysia |
| Amount of Reductions | 123,449 metric tonnes CO2 equivalent per annum |
| Crediting Period | 01 Jun 2013 - 31 May 2023 (Fixed) |
| Inclusion date | 12 Dec 2012 (submitted at the time of requesting registration of the PoA) |

cpa design document
Appendix 2 - CPA-DD-Bera ER Cost Analysis - ACM0018 (ver 2.3) 06122012.xlsx
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: