CPA 10411-P1-0002-CP1 : CPA001 Senegal Rural Electrification - Mini-Grids
PoA 10411: Senegal Rural Electrification Program
CPA CPA001 Senegal Rural Electrification - Mini-Grids
cpa design document (895 KB)

Additional documents for this specific CPA
Appendix 1 - CPA1_MG_ERs_v.8._2018_05 (67 KB)

Additional inclusion documents
CDM Validation report final CPAs May18 (1029 KB)
CPA inclusion form (148 KB)
Host Parties Senegal
Amount of Reductions 19,992 metric tonnes CO2 equivalent per annum
Crediting Period 01 Jun 2018 - 31 May 2025 (Renewable)
Inclusion date 18 May 2018 (view inclusion)