11:53 31 Jan 25
CPA
9442-P2-0005-CP1 :
50 MW Wind Power Project located in Nooriabad, Thatta district of Sindh Province, Pakistan : CPA 005
PoA | 9442: Renewable Energy based PoA in Pakistan |
---|---|
CPA |
50 MW Wind Power Project located in Nooriabad, Thatta district of Sindh Province, Pakistan : CPA 005
cpa design document (2021 KB) Additional documents for this specific CPA Appendix 1 - ER CPA 005 UN 9442 BELL CDM PoA CPA INCL 20622 (83 KB) Appendix 2 - CPA CPA 005 UN 9442 BELL CDM PoA CPA INCL 20622 (23 KB) Additional inclusion documents FVR CPA 005 UN 9442 BELL CDM PoA CPA INCL 20622 (1145 KB) CPA inclusion form (52 KB) |
Host Parties | Pakistan |
Amount of Reductions | 97,792 metric tonnes CO2 equivalent per annum |
Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
Crediting Period | 20 May 2023 - 19 May 2033 (Fixed) |
Inclusion date | 18 May 2023 Provisional (awaiting guidance from the CMP at CMP 16) (view inclusion) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: