02:52 11 Nov 25
CPA
9863-P1-0003-CP1 :
CPA 3: Inclusion of Mumbai Metro Rail Corporation Limited Colaba-Bandra-Seepz corridor under MRTS POA
| PoA | 9863: The MRTS PoA |
|---|---|
| CPA |
CPA 3: Inclusion of Mumbai Metro Rail Corporation Limited Colaba-Bandra-Seepz corridor under MRTS POA
cpa design document (1619 KB)
Additional documents for this specific CPA Appendix 1 - ER Spreadsheet (16 KB)
Appendix 2 - Validation Report (1006 KB)
Additional inclusion documents CPA inclusion form (4377 KB)
|
| Host Parties | India |
| Amount of Reductions | 261,968 metric tonnes CO2 equivalent per annum |
| Crediting Period | 01 Jan 2021 - 31 Dec 2030 (Fixed) |
| Inclusion date | 21 Dec 2017 Provisional (awaiting guidance from the CMP at CMP 16) (view inclusion) |

cpa design document
Appendix 1 - ER Spreadsheet
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: