21:58 29 Nov 25
CPA
9442-P2-0002-CP1 :
CPA 002: 50 MW Wind Power Project in Jhimpir, Sindh Pakistan
| PoA | 9442: Renewable Energy based PoA in Pakistan |
|---|---|
| CPA |
CPA 002: 50 MW Wind Power Project in Jhimpir, Sindh Pakistan
cpa design document (1567 KB)
Additional documents for this specific CPA Appendix 1 - CPA ER PoA 9442 TQC 3122 (87 KB)
Additional inclusion documents CPA FVR PoA 9442 TQC 3122 (886 KB)
CPA inclusion form (51 KB)
|
| Host Parties | Pakistan |
| Amount of Reductions | 97,792 metric tonnes CO2 equivalent per annum |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Crediting Period | 22 Sep 2022 - 21 Sep 2032 (Fixed) |
| Inclusion date | 22 Sep 2022 Provisional (awaiting guidance from the CMP at CMP 16) (view inclusion) |

cpa design document
Appendix 1 - CPA ER PoA 9442 TQC 3122
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: