CPA 9442-P2-0002-CP1 : CPA 002: 50 MW Wind Power Project in Jhimpir, Sindh Pakistan
PoA 9442: Renewable Energy based PoA in Pakistan
CPA CPA 002: 50 MW Wind Power Project in Jhimpir, Sindh Pakistan
cpa design document (1567 KB)

Additional documents for this specific CPA
Appendix 1 - CPA ER PoA 9442 TQC 3122 (87 KB)

Additional inclusion documents
CPA FVR PoA 9442 TQC 3122 (886 KB)
CPA inclusion form (51 KB)
Host Parties Pakistan
Amount of Reductions 97,792 metric tonnes CO2 equivalent per annum
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Crediting Period 22 Sep 2022 - 21 Sep 2032 (Fixed)
Inclusion date 22 Sep 2022 Provisional (awaiting guidance from the CMP at CMP 16) (view inclusion)