CPA 9705-P1-0002-CP1 : 3.8MW Bulathwaththa Small Hydropower Project<2014-MPM-004-3.8MW>
PoA 9705: Programme of Activities for Small Scale Hydropower CDM in Sri Lanka
CPA 3.8MW Bulathwaththa Small Hydropower Project<2014-MPM-004-3.8MW>
cpa design document (1391 KB) ( approved - 25 Oct 2020 - view previous)

Additional documents for this specific CPA
Appendix 1 - ER calculation sheet (68 KB)
Appendix 2 - Verification report (1836 KB)

Additional inclusion documents
CPA inclusion form (76 KB)
Host Parties Sri Lanka
Amount of Reductions 9,058 metric tonnes CO2 equivalent per annum
Crediting Period 01 Sep 2015 - 31 Aug 2022 (Renewable - Expired) . No further renewal
Inclusion date 12 Aug 2015 (view inclusion)