CPA 9416-P1-0007-CP1 : Welturi II wind power project in Maharashtra
PoA 9416: Promotion of renewable energy generation in India- Programme of Activities
CPA Welturi II wind power project in Maharashtra
cpa design document (495 KB) ( approved - 01 Dec 2022 - view previous)

Additional documents for this specific CPA
Appendix 1 - IRR_ER_Welturi II Sep 2014.xls (160 KB)
Appendix 2 - FVRP_2014IQ23MD_v1.1Aa_29.12.2014_approved.pdf (1180 KB)
Appendix 3 - PoA9416-CPA007-Common Practice analysis sheet.xls (950 KB)
Appendix 4 - PoA9416-CPA007 IRR, Ex-ante ER calculation sheet.xls (188 KB)

Additional inclusion documents
CPA inclusion form (702 KB)
Host Parties India
Amount of Reductions 42,066 metric tonnes CO2 equivalent per annum
Crediting Period 08 Jan 2015 - 07 Jan 2022 (Renewable)

Other period(s): 08 Jan 22 - 07 Jan 29
Inclusion date 08 Jan 2015 (view inclusion)