CPA 9442-P2-0003-CP1 : 50 MW Wind Power Project located at Thatta by AWPPL
PoA 9442: Renewable Energy based PoA in Pakistan
CPA 50 MW Wind Power Project located at Thatta by AWPPL
cpa design document (1717 KB)

Additional documents for this specific CPA
Appendix 1 - CPA 003_CP analysis (21 KB)
Appendix 2 - CPA 003_ER sheet_Ver 03.0 (82 KB)
Appendix 3 - CPA003_FVR_PoA 9442_TQC 3122 (367 KB)

Additional inclusion documents
CPA inclusion form (51 KB)
Host Parties Pakistan
Amount of Reductions 96,506 metric tonnes CO2 equivalent per annum
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Crediting Period 10 Nov 2022 - 09 Nov 2032 (Fixed)
Inclusion date 10 Nov 2022 Provisional (awaiting guidance from the CMP at CMP 16) (view inclusion)