CPA 9442-P2-0004-CP1 : 50 MW Wind Power Generation Plant located in the Jhimpir Wind Corridor, Thatta district of Sindh Province, Pakistan: CPA 004
PoA 9442: Renewable Energy based PoA in Pakistan
CPA 50 MW Wind Power Generation Plant located in the Jhimpir Wind Corridor, Thatta district of Sindh Province, Pakistan: CPA 004
cpa design document (2137 KB)

Additional documents for this specific CPA
Appendix 1 - ER UN CPA 004 BELL CDM PoA 18822 (83 KB)
Appendix 2 - Common Practice Analysis UN CPA 004 BELL CDM PoA 18822 (23 KB)

Additional inclusion documents
FVR UN CPA 004 BELL CDM PoA 18822 (1382 KB)
CPA inclusion form (52 KB)
Host Parties Pakistan
Amount of Reductions 97,792 metric tonnes CO2 equivalent per annum
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Crediting Period 01 May 2023 - 30 Apr 2033 (Fixed)
Inclusion date 28 Apr 2023 Provisional (awaiting guidance from the CMP at CMP 16) (view inclusion)