12:40 15 Nov 25
CPA
10429-P1-0001-CP1 :
-
| PoA | 10429: Mali Rural Electrification Program |
|---|---|
| CPA |
-
cpa design document (11 KB)
Additional inclusion documents CPA inclusion form (11 KB)
|
| Host Parties | Mali |
| Amount of Reductions | 0 metric tonnes CO2 equivalent per annum |
| Crediting Period |
01 Mar 2018
-
02 Mar 2018
(Fixed)
Crediting period of the CPA starts on the date specified above or on the date of inclusion, whichever is later
Other period(s): 05 Jun 18 - 04 Jun 28 |

cpa design document
Crediting period of the CPA starts on the date specified above or on the date of inclusion, whichever is later
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: