CPA 5324-P1-0005-CP1 : Ta Nung Hydropower Project
PoA 5324: Than Thien Small Hydropower Programme of Activities Managed by INTRACO
CPA Ta Nung Hydropower Project
cpa design document (931 KB)

Additional documents for this specific CPA
Appendix 1 - FVR_Ta Nung (2027 KB)
Appendix 2 - ER_Ta Nung (55 KB)
Appendix 3 - IRR_Ta Nung (103 KB)

Additional inclusion documents
CPA inclusion form (86 KB)
Host Parties Viet Nam
Amount of Reductions 4,381 metric tonnes CO2 equivalent per annum
Crediting Period 01 Jul 2013 - 30 Jun 2023 (Fixed)
Inclusion date 29 Jun 2013 (view inclusion)