CPA 9797-P1-0001-CP1 : Tunel Melado Run of River Hydro Power Plant, Chile
PoA 9797: Run of River Hydro Power Plants in Chile
CPA Tunel Melado Run of River Hydro Power Plant, Chile
cpa design document (993 KB)

Additional documents for this specific CPA
Appendix 1 - EF-SIC_and_ER_calculation_Tunel_Melado_Version_4 (667 KB)
Appendix 2 - run_of_river_CPA_Validation_Report_rev02.1_Clean (875 KB)
Appendix 3 - run_of_river_CPA_Validation_Report_rev02.1_track_changes (740 KB)

Additional inclusion documents
CPA inclusion form (409 KB)
Host Parties Chile
Amount of Reductions 10,989 metric tonnes CO2 equivalent per annum
Crediting Period 01 Oct 2015 - 30 Sep 2022 (Renewable - Expired) . No further renewal
Inclusion date 20 Mar 2014 (submitted at the time of requesting registration of the PoA)