19:34 23 Nov 24
CPA
9797-P1-0001-CP1 :
Tunel Melado Run of River Hydro Power Plant, Chile
PoA | 9797: Run of River Hydro Power Plants in Chile |
---|---|
CPA |
Tunel Melado Run of River Hydro Power Plant, Chile
cpa design document (993 KB) Additional documents for this specific CPA Appendix 1 - EF-SIC_and_ER_calculation_Tunel_Melado_Version_4 (667 KB) Appendix 2 - run_of_river_CPA_Validation_Report_rev02.1_Clean (875 KB) Appendix 3 - run_of_river_CPA_Validation_Report_rev02.1_track_changes (740 KB) Additional inclusion documents CPA inclusion form (409 KB) |
Host Parties | Chile |
Amount of Reductions | 10,989 metric tonnes CO2 equivalent per annum |
Crediting Period | 01 Oct 2015 - 30 Sep 2022 (Renewable - Expired) . No further renewal |
Inclusion date | 20 Mar 2014 (submitted at the time of requesting registration of the PoA) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: