CPA 7156-P1-0001-CP1 : Muritiba Wind Power Plant CPA
PoA 7156: Omega Wind Power Plants Programme of Activities
CPA Muritiba Wind Power Plant CPA
cpa design document (462 KB)

Additional documents for this specific CPA
Appendix 1 - CPA Muritiba - Validation Report - v02 - 18 abr 2012 FINAL clean.pdf (2715 KB)
Appendix 2 - Muritiba_CERs_2012.02.17_v.2.xls (95 KB)
Appendix 3 - FCF_Muritiba_EQAO_v.4 - UNFCCC public version.pdf (27 KB)
Appendix 4 - WACC ElectricGen_2011 01 v3.xlsx (333 KB)

Additional inclusion documents
CPA inclusion form (113 KB)
Host Parties Brazil
Amount of Reductions 11,229 metric tonnes CO2 equivalent per annum
Crediting Period 01 Jan 2016 - 31 Dec 2022 (Renewable - Expired) . No further renewal
Inclusion date 31 Aug 2012 (submitted at the time of requesting registration of the PoA)