CPA 7883-P1-0004-CP1 : Los Patos Small Scale Central Hydroelectric Project, San Marcos, Guatemala (SSC-CPA Los Patos)
PoA 7883: Hydro Alliance Programme of Activities
CPA Los Patos Small Scale Central Hydroelectric Project, San Marcos, Guatemala (SSC-CPA Los Patos)
cpa design document (1005 KB)

Additional documents for this specific CPA
Appendix 1 - Baseline Information_Los Patos (2734 KB)
Appendix 2 - Los Patos_financial analysis (481 KB)
Appendix 3 - VAL REP_Los Patos (696 KB)

Additional inclusion documents
CPA inclusion form (178 KB)
Host Parties Guatemala
Amount of Reductions 16,308 metric tonnes CO2 equivalent per annum
Crediting Period 16 Nov 2016 - 15 Nov 2023 (Renewable - Expired) . No further renewal
Inclusion date 16 Nov 2016 (view inclusion)