CPA 9863-P1-0004-CP1 : CPA004: Chennai Metro Rail Limited Corridor 1 Extension, Corridor 3, Corridor 4 and Corridor 5 under MRTS PoA
PoA 9863: The MRTS PoA
CPA CPA004: Chennai Metro Rail Limited Corridor 1 Extension, Corridor 3, Corridor 4 and Corridor 5 under MRTS PoA
cpa design document (1879 KB)

Additional documents for this specific CPA
Appendix 1 - Final Validation Report_clean (759 KB)
Appendix 2 - ER Spread sheet (40 KB)


Additional inclusion documents
CPA inclusion form (331 KB)
Host Parties India
Amount of Reductions 568,495 metric tonnes CO2 equivalent per annum
Crediting Period 01 Apr 2025 - 31 Mar 2035 (Fixed)
Inclusion date 06 Aug 2019 Provisional (awaiting guidance from the CMP at CMP 16) (view inclusion)