23:43 19 Feb 26
CPA
5324-P1-0002-CP1 :
Dak Pone 2AB Hydropower Project
| PoA | 5324: Than Thien Small Hydropower Programme of Activities Managed by INTRACO |
|---|---|
| CPA |
Dak Pone 2AB Hydropower Project
cpa design document (927 KB)
Additional documents for this specific CPA Appendix 1 - Dak Pone 2AB_ER Calculation (48 KB)
Appendix 2 - Dak Pone 2AB_IRR Calculation Sheet (107 KB)
Additional inclusion documents Than Thien Hydropower PoA-DD_03_04 2013 (1427 KB)
CPA inclusion form (423 KB)
|
| Host Parties | Viet Nam |
| Amount of Reductions | 12,934 metric tonnes CO2 equivalent per annum |
| Crediting Period | 01 Jun 2013 - 31 May 2023 (Fixed) |
| Inclusion date | 27 Apr 2013 (view inclusion) |

cpa design document
Appendix 1 - Dak Pone 2AB_ER Calculation
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: