11:10 15 Nov 25
CPA
5324-P1-0008-CP1 :
Dak Pone2 Hydropower Project
| PoA | 5324: Than Thien Small Hydropower Programme of Activities Managed by INTRACO |
|---|---|
| CPA |
Dak Pone2 Hydropower Project
cpa design document (1531 KB)
Additional documents for this specific CPA Appendix 1 - Than Thien CPA Inclusion_Dak Pone 2 FVR (1189 KB)
Appendix 2 - Dak Pone 2_ER Calculation (55 KB)
Additional inclusion documents CPA inclusion form (86 KB)
|
| Host Parties | Viet Nam |
| Amount of Reductions | 8,913 metric tonnes CO2 equivalent per annum |
| Crediting Period | 01 Jul 2013 - 30 Jun 2023 (Fixed) |
| Inclusion date | 29 Jun 2013 (view inclusion) |

cpa design document
Appendix 2 - Dak Pone 2_ER Calculation
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: