CPA 5616-P1-0001-CP1 : 1.1 MW Manggani Mini Hydroelectric Project, West Sumatera, Indonesia (SSC-CPA Manggani)
PoA 5616: Sustainable Small Hydropower Programme of Activities (PoA) in Indonesia
CPA 1.1 MW Manggani Mini Hydroelectric Project, West Sumatera, Indonesia (SSC-CPA Manggani)
cpa design document (4316 KB)

Additional documents for this specific CPA
Appendix 1 - Enclosure CPA (321 KB)
Appendix 2 - Enclosure 1 CPA (979 KB)
Appendix 3 - Validation Report CPA (4238 KB)

Additional inclusion documents
CPA inclusion form (579 KB)
Host Parties Indonesia
Amount of Reductions 5,321 metric tonnes CO2 equivalent per annum
Crediting Period 31 May 2013 - 30 May 2020 (Renewable - Expired) . No further renewal
Inclusion date 02 May 2012 (submitted at the time of requesting registration of the PoA)