CPA 6810-P1-0007-CP1 : CPA7_Bao Lam 1 Hydropower Project.
PoA 6810: Vietnam Renewable Energy Development Program (REDP)
CPA CPA7_Bao Lam 1 Hydropower Project.
cpa design document (1083 KB)

Additional documents for this specific CPA
Appendix 1 - VN REDP Bao Lam 1 ER Ver02 2015.07.30 (201 KB)
Appendix 2 - VN REDP Bao Lam 1 FA ver02 (191 KB)
Appendix 3 - VAL_REP_CPA7 _Bao Lam 1_v03 FINAL 31072015 (1099 KB)

Additional inclusion documents
CPA inclusion form (151 KB)
Host Parties Viet Nam
Amount of Reductions 62,270 metric tonnes CO2 equivalent per annum
Crediting Period 30 Nov 2016 - 29 Nov 2023 (Renewable)
Inclusion date 31 Jul 2015 (view inclusion)