CPA 10411-P1-0006-CP1 : CPA005 Senegal Rural Electrification – Grid Extension
PoA 10411: Senegal Rural Electrification Program
CPA CPA005 Senegal Rural Electrification – Grid Extension
cpa design document (636 KB)

Additional documents for this specific CPA
Appendix 1 - CPA5_Grid_ERs (26 KB)
Appendix 2 - Validation Report Inclusion CPAs_June 2021 v02 (718 KB)

Additional inclusion documents
CPA inclusion form (89 KB)
Host Parties Senegal
Amount of Reductions 38,731 metric tonnes CO2 equivalent per annum
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Crediting Period 01 Jan 2021 - 31 Dec 2027 (Renewable)
Inclusion date 28 Dec 2020 Provisional (awaiting guidance from the CMP at CMP 16) (view inclusion)