CPA 9502-P1-0002-CP1 : 10 MW Solar Power Project in Kemwadi, Maharashtra: CPA S002
PoA 9502: PoA on RE
CPA 10 MW Solar Power Project in Kemwadi, Maharashtra: CPA S002
cpa design document (845 KB)

Additional documents for this specific CPA
Appendix 1 - CPA StartDate_Proof PO (125 KB)
Appendix 2 - ER_Calculations (46 KB)
Appendix 3 - Stakeholder_Minutes (1001 KB)

Additional inclusion documents
VR_navalakha-CPA-S002 clean (316 KB)
CPA inclusion form (31 KB)
Host Parties India
Amount of Reductions 14,920 metric tonnes CO2 equivalent per annum
Crediting Period 01 Sep 2014 - 31 Aug 2021 (Renewable)

Other period(s): 01 Sep 21 - 31 Aug 28
Inclusion date 18 Jul 2014 (view inclusion)