CPA 9502-P1-0008-CP1 : 10 MW Solar PV power project at NTPC Talcher - Kaniha: CPA S008
PoA 9502: PoA on RE
CPA 10 MW Solar PV power project at NTPC Talcher - Kaniha: CPA S008
cpa design document (783 KB)

Additional documents for this specific CPA
Appendix 1 - Validation Report (707 KB)
Appendix 2 - CER Spreadsheet (782 KB)

Additional inclusion documents
CPA inclusion form (146 KB)
Host Parties India
Amount of Reductions 13,381 metric tonnes CO2 equivalent per annum
Crediting Period 20 Oct 2017 - 19 Oct 2024 (Renewable)
Inclusion date 20 Oct 2017 (view inclusion)