CPA 5588-P1-0001-CP1 : 15122010 First Bundled CPA on Grid Connected Solar Power Project in India by SENES consultants
PoA 5588: First Solar PoA in India by SENES Consultants
CPA 15122010 First Bundled CPA on Grid Connected Solar Power Project in India by SENES consultants
cpa design document (552 KB)

Additional documents for this specific CPA
Appendix 1 - 5588- NPV Calculation (282 KB)
Appendix 2 - 5588_CERcalc_28032012 (867 KB)
Appendix 3 - 5588_specific_CPA_FVR_28032012 (768 KB)

Additional inclusion documents
CPA inclusion form (772 KB)
Host Parties India
Amount of Reductions 22,762 metric tonnes CO2 equivalent per annum
Crediting Period 28 Mar 2012 - 27 Mar 2019 (Renewable - Expired) . No further renewal
Inclusion date 28 Mar 2012 (submitted at the time of requesting registration of the PoA)