CPA 9502-P2-0003-CP2 : 9.13 MW Solar Power Project by KRBL Limited: CPA S003
[]
PoA 9502: PoA on RE
CPA 9.13 MW Solar Power Project by KRBL Limited: CPA S003
cpa design document (868 KB)

Additional documents for this specific CPA
Appendix 1 - ER CPA S003 BELL_CDM_CPA_PoA_RCP_19622 (27 KB)
Appendix 2 - FVR CPA S003 BELL_CDM_CPA_PoA_RCP_19622 (248 KB)

Additional renewal documents
CPA renewal form (76 KB)
Host Parties India
Amount of Reductions 13,463 metric tonnes CO2 equivalent per annum
Crediting Period 01 Oct 2021 - 30 Sep 2028 (Renewable)

Other period(s): 01 Oct 14 - 30 Sep 21
Renewal date 30 Sep 2022 Provisional (awaiting guidance from the CMP at CMP 16) (view renewal)