11:18 15 Nov 24
CPA
9863-P1-0003-CP1 :
CPA 3: Inclusion of Mumbai Metro Rail Corporation Limited Colaba-Bandra-Seepz corridor under MRTS POA
PoA | 9863: The MRTS PoA |
---|---|
CPA |
CPA 3: Inclusion of Mumbai Metro Rail Corporation Limited Colaba-Bandra-Seepz corridor under MRTS POA
cpa design document (1619 KB) Additional documents for this specific CPA Appendix 1 - ER Spreadsheet (16 KB) Appendix 2 - Validation Report (1006 KB) Additional inclusion documents CPA inclusion form (4377 KB) |
Host Parties | India |
Amount of Reductions | 261,968 metric tonnes CO2 equivalent per annum |
Crediting Period | 01 Jan 2021 - 31 Dec 2030 (Fixed) |
Inclusion date | 21 Dec 2017 Provisional (awaiting guidance from the CMP at CMP 16) (view inclusion) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: